Table 7-2. Mx2820 M13 Mux Installation Checklist; Acceptance Test Checklist - ADTRAN MX2820 System Manual

Adtran mx2820 multiplexer: system manual
Hide thumbs Also See for MX2820:
Table of Contents

Advertisement

MX2820 System Manual

ACCEPTANCE TEST CHECKLIST

MX2820 Shelf Installation in a Central Office Checklist
Table 7-2
provides the checklist. Write N/A by any step which does not apply to the installed
configuration.

Table 7-2. MX2820 M13 MUX Installation Checklist

Test Step
1. DS1 Daisy-chain to DS3/STS-1
(hard) Loopback.
2. DS1 to DS3/STS-1 "Head-to-Head"
Test.
3. DS1 to DS3/STS-1 (hard) Loop-
back.
4. MUX Module Redundancy
Comments
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Installation Engineer Sign-off
Name (print): _________________________ Date Completed: ___________________________
Customer Sign-off
Name (print): _________________________ Date Completed: ___________________________
7-50
Completed (Initial)
Signature: _________________________________
Signature: _________________________________
61186003L1-1D

Advertisement

Table of Contents
loading

Table of Contents