10. If provisioning tasks for the SCU are to be performed at this time, refer to
Trouble Clearing
11. If the M13 MUX modules are to be installed into the shelf at this time, go to "NTP-002".
12. If the STS-1 MUX modules are to be installed into the shelf at this time, go to "NTP-003".
13. If no MUXes are to be installed at this time, this procedure is complete.

FOLLOW-UP PROCEDURES

Once this procedure is complete, return to the procedure which called out this DLP and
continue with the tasks indicated.
7-30
Procedures", to determine which SCU provisioning tasks are required.