Sts-1 Mux Installation; Introduction; Prerequisite Procedures; Materials Required - ADTRAN MX2820 System Manual

Adtran mx2820 multiplexer: system manual
Hide thumbs Also See for MX2820:
Table of Contents

Advertisement

STS-1 MUX Installation

INTRODUCTION

This NTP provides the tasks for installing the MX2820 STS-1 MUX module into a Central
Office (CO) shelf. Installation procedures include removal of the product from its packaging,
inspecting for damage, seating the unit in the shelf, provisioning the module, and acceptance
testing.

PREREQUISITE PROCEDURES

Before starting this procedure, determine if a 1:1 redundant configuration is being deployed.
Whether a redundant configuration is being deployed affects when the provisioning proce-
dures for the STS-1 MUX modules can take place.
The following procedures must be completed before installing the STS-1 MUX module. If
necessary, refer to the appropriate documentation before proceeding.
• "NTP-001,
Shelf and SCU Installation"
• "NTP-003,
Clock Module Installation"
• "DLP-706,
Connect Low-Speed Cabling"
• "DLP-709,
Connect High-Speed Cabling"

MATERIALS REQUIRED

• MX2820 STS-1 MUX module (two modules for 1:1 redundant system)
To comply with NEBS fire test requirements for CO, hut, and vault
installations, vacant slots in the MX2820 shelf need to have blank
front panels installed.
At this point in the initial NTP for the MX2820 system, power
should be applied to the shelf.
61186003L1-1D
NTP-004
WARNING
NOTE
6-11

Advertisement

Table of Contents
loading

Table of Contents