MX2820 System Manual
FOLLOW-UP PROCEDURES
If this is an initial installation, the SCU can be provisioned at this time or the M13 MUX
modules can be installed.
If installing Modules, refer to the following NTP:
• For M13 MUX installation, "NTP-002,
• For STS-1 MUX installation, "NTP-003,
6-6
M13 MUX Installation"
Clock Module Installation"
61186003L1-1D