HPE ProLiant DL385 Gen10 Plus v2 Maintenance And Service Manual page 92

Hide thumbs Also See for ProLiant DL385 Gen10 Plus v2:
Table of Contents

Advertisement

a. Position the heatsink on top of the processor, ensuring that it is properly seated before securing the screws.
b. Use a T-20 Torx screwdriver to tighten the captive screws in the sequence specified on the heatsink label.
When using a torque wrench to tighten the screws, apply a torque of 1.58 N-m (14 lbf-in).
16. Install the air baffle
17. Install the access panel.
18. Install the server into the rack.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server.
Removing and replacing an energy pack
Removing and replacing an energy pack
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
4. Remove the access panel .
5. Do one of the following:
Remove the air baffle .
HPE ProLiant DL385 Gen10 Plus v2 Server Maintenance and Service Guide
92

Advertisement

Table of Contents
loading

Table of Contents