HPE ProLiant DL385 Gen10 Plus v2 Maintenance And Service Manual page 90

Hide thumbs Also See for ProLiant DL385 Gen10 Plus v2:
Table of Contents

Advertisement

12. Install the new processor:
a. Hold the processor by its carrier handle and slide the processor into the rail frame until it engages with a click sound.
b. Hold the lift tabs near the front end of the rail frame and pivot the rail frame to the closed position.
A click sound indicates that the rail frame is properly engaged.
13. Close the force frame:
CAUTION:
CAUTION:
Do not overtighten the screws as this might damage the system board or the processor socket.
a. Pivot the spring loaded force frame downward and hold it down (callout 1).
b. Use a T-20 Torx screwdriver to tighten the captive screws in the sequence shown in the following image (callouts 2–4).
HPE ProLiant DL385 Gen10 Plus v2 Server Maintenance and Service Guide
90

Advertisement

Table of Contents
loading

Table of Contents