This section describes how to operate the UPS.
7 7 . . 1 1
U U P P S S C C o o n n t t r r o o l l s s a a n n d d I I n n d d i i c c a a t t o o r r s s
The controls and indicators identified and described in this section are used to control and monitor UPS
operation.
(optional).

Figure 79. UPS Controls and Indicators

ISBM
NOTE 1
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2
Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
NOTE 3
The UPS displays two minutes of battery runtime at the initial startup. After a 24-hour
charging period, the UPS automatically runs a battery test and the correct battery
runtime displays.
Figure 79
Identifies the touchscreen control panel and the location of the CB1 circuit breaker
Eaton
®
Power Xpert
Touchscreen
Control Panel
AC Input Breaker
CB1 (optional)
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
ISBM
(Right Door
Removed)