UPS Installation Plan and Unpacking
Table 8. 480V Input/Output Ratings and External Wiring Requirements for the Three UPM – Common Battery
Basic Unit Rating
Input and Output Voltage
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
DC Input from Battery Disconnect to UPS
(3) Phases, (1) Negative
Minimum Conductor Size
Number per Pole
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Ground
Minimum Conductor Size
Number per Phase
NOTE Callout letters A, B, C, and D map to
NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may
interrupt the UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly, however it is important to evaluate whether the critical load will function properly as its neutral reference is
rapidly (50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will
interrupt the return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.
30
Eaton
®
Figure
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
Units
kVA
675
675
kW
480/480 480/480 480/480 480/480
Volts
Amps
1002
A
AWG or kcmil
500
(each)
(6)
Amps
812
B
AWG or kcmil
500
(each)
(5)
Total Amps
1480
C
AWG or kcmil
500
(each)
(12)
Total Amps
812
D
AWG or kcmil
500
(each)
(5)
68..
Rating 50/60 Hz
750
825
900
750
825
825
480/480
1113
1225
1225
500
500
500
(6)
(6)
(6)
902
992
1083
500
500
500
(5)
(5)
(5)
1645
1809
1809
500
500
500
(12)
(12)
(12)
902
992
1083
500
500
500
(5)
(5)
(5)
900
900
1336
500
(6)
1083
500
(5)
1974
500
(12)
1083
500
(5)