Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual page 36

Table of Contents

Advertisement

UPS Installation Plan and Unpacking
If Eaton battery cabinets are located in the same room as the UPS, the battery cabinet environmental
requirements supercede the UPS requirements. Operating temperatures above the recommended range will
result in decreased battery life and performance, and will reduce or void the battery warranty. Refer to Eaton's
Terms and Conditions of Sale with Battery Replacement Coverage and the Battery Replacement Price Book for
more information. These documents can be found at www.eaton.com/ powerquality or contact an Eaton
service representative to obtain copies.
The UPS ventilation requirements are shown in
Table 4. 480V Air Conditioning and Ventilation Requirements During Full Load Operation
Model
Eaton 9395P-1200/1200
(CSS or IOM)
Eaton 9395P-1200/1200
(CSS or IOM)
Eaton 9395P-1200/1100
(CSS or IOM)
Eaton 9395P-1200/1000
(CSS or IOM)
Eaton 9395P-1200/900
(CSS or IOM)
Eaton 9395P-1200/900
(CSS or IOM)
Eaton 9395P-1200/825
(CSS or IOM)
Eaton 9395P-1200/750
(CSS or IOM)
Eaton 9395P-1200/675
(CSS or IOM)
NOTE CSS = Continuous Static Switch; IOM = Input Output Module
18
Eaton
®
Rating
1200 kVA
1200 kVA
1200 kVA
1100 kVA
1100 kVA
1100 kVA
1000 kVA
1000 kVA
900 kVA
900 kVA
900 kVA
825 kVA
825 kVA
825 kVA
750 kVA
750 kVA
675 kVA
675 kVA
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
Table 4
and
Table
5.
Input/
Output
Heat Rejection BTU/hr
Voltage
x1000 (kg-cal/hr)
480/480
46.1 (157)
480/480
42.3 (144)
480/480
42.3 (144)
480/480
37.3 (128)
480/480
34.6 (118)
480/480
34.6 (118)
480/480
31.7 (108)
480/480
28.0 (95.6)
480/480
23.8 (81.1)
Ventilation Required for
Cooling Air Exhaust
Approximately 4250 liter/sec
(9000 CFM)
Approximately 4250 liter/sec
(9000 CFM)
Approximately 3300 liter/sec
(7000 CFM)

Advertisement

Table of Contents
loading

Table of Contents