Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual page 116

Table of Contents

Advertisement

Installing Options and Accessories
5 5 . . 2 2
I I n n s s t t a a l l l l i i n n g g D D i i s s t t r r i i b b u u t t e e d d B B y y p p a a s s s s C C o o n n t t r r o o l l W W i i r r i i n n g g
NOTE 1
NOTE 2
To install distributed bypass control wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
Perform the procedure listed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
3.
Terminal block TB3 is accessible on the left side of the X-Slot communication bay (see
access to terminal block TB1, TB2, and the left interface entry conduit landing plates, remove the screws
securing the top internal safety shield panel and remove the panel. Retain the hardware for later use.
4.
Remove the interface entry conduit landing plates to drill or punch holes (see
5.
Reinstall the interface entry plates and install the conduit.
6.
To locate the appropriate terminals and review the wiring and termination requirements, see paragraph
3.2.4 UPS System Power Wiring
7.
Route and install CAN wiring between the UPS cabinets. See
Hot Sync CAN Bridge Card terminal location and
8.
If a tie cabinet with Module Output Breakers (MOBs) is being wired, proceed to Step 11; otherwise,
proceed to Step 9.
9.
Route and install distributed bypass system pull-chain wiring between the UPS cabinets. See
and
Table 31
10. Proceed to Step 12.
11. Route and install distributed bypass system pull-chain wiring between the UPS cabinets and tie cabinet
MOBs. See
NOTE
12. Reinstall the small top internal safety shield panel and secure with the cabinet mounted screws.
13. Close the front door and secure the latch.
98
Eaton
®
When installing external wiring to the Powerware Hot Sync CAN Bridge Card, conduit
must be installed to the UPS cabinet. When installing internal wiring to the Powerware
Hot Sync CAN Bridge Card terminals, route the wiring through the internal opening in
the X-Slot communication bay.
When installing interface wiring for the pull chain, conduit must be installed between
UPSs.
Preparation,
for wiring information.
Figure 53
and
Table 32
Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be
performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service
representative to schedule a date.
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
for shutdown instructions.
Card.
Table
27, and
Figure 28
Figure 49
Figure
50,
Figure
for wiring information.
Figure
Figure
32).
through
Figure
31.
and
Table 29
for the Powerware
51, and
Table 30
for wiring information.
40). To gain
Figure 52

Advertisement

Table of Contents
loading

Table of Contents