Figure 56. J1, J2, J3, And J4 15-Pin D-Sub Connectors - Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual

Table of Contents

Advertisement

Table 34. J1 through J4 Interface Connectors
Status
UPS AVAILABLE
UPS OFFLINE
BATTERY WEAK
UTILITY FAILURE

Figure 56. J1, J2, J3, and J4 15-Pin D-Sub Connectors

5 5 . . 5 5
I I n n s s t t a a l l l l i i n n g g a a n n O O p p t t i i o o n n a a l l S S u u p p e e r r v v i i s s o o r r y y C C o o n n t t a a c c t t M M o o d d u u l l e e I I I I
To install SCM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
Perform the procedure listed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
NOTE
3.
Securely mount the SCM II at the desired location. See
NOTE
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (see
Figure
J1 through J4
Pins 1 and 12
Pins 3 and 13
Pins 5 and 14
Pins 6 and 15
Figure 5 9. J1, J2, J3, and J4 15-Pin D-Sub Connectors
If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the
wall. Do not use hollow wall anchors
When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
32).
Eaton
®
Power Xpert
Description
Contacts are closed when the UPS is operating in Online mode or ready to
supply the load.
Contacts are open when the UPS is offline. Contacts are closed when the UPS
is operating in Online mode.
Contacts are closed when approximately two minutes of battery time remains
before the critical load is lost.
Contacts are closed when Utility Failure is detected.
15-Pin D Sub
Connectors
for shutdown instructions.
Card.
Figure 61
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
Installing Options and Accessories
for mounting hole locations.
107

Advertisement

Table of Contents
loading

Table of Contents