Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual page 17

Table of Contents

Advertisement

L L i i s s t t o o f f T T a a b b l l e e s s
Table 1.
Storage Area Contaminants ............................................................................................................ 16
Table 2.
UPS Cabinet Maximum Weights....................................................................................................... 17
Table 3.
UPS Cabinet Clearances ................................................................................................................. 17
Table 4.
480V Air Conditioning and Ventilation Requirements During Full Load Operation ......................................... 18
Table 5.
415V/400V/380V Air Conditioning and Ventilation Requirements During Full Load Operation.......................... 19
Table 6.
480V Input/Output Ratings and External Wiring Requirements for the Four UPM – Common Battery............... 28
Table 7.
480V Input/Output Ratings and External Wiring Requirements for the Four UPM – Separate Battery ............... 29
Table 8.
480V Input/Output Ratings and External Wiring Requirements for the Three UPM – Common Battery ............. 30
Table 9.
480V Input/Output Ratings and External Wiring Requirements for the Three UPM – Separate Battery ............. 31
Table 10.
415V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common
Battery ........................................................................................................................................ 32
Table 11.
415V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Separate
Battery ........................................................................................................................................ 33
Table 12.
400V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common
Battery ........................................................................................................................................ 34
Table 13.
400V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Separate
Battery ........................................................................................................................................ 35
Table 14.
380V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common
Battery ........................................................................................................................................ 36
Table 15.
380V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Separate
Battery ........................................................................................................................................ 37
Table 16.
UPS Intercabinet Power Cable Terminations for the Three/Four UPM Models ............................................ 38
Table 17.
Supplied Intercabinet Wiring Terminal Hardware Kit .............................................................................. 39
Table 18.
UPS External Power Cable Terminations for Three/Four UPM Models ...................................................... 39
Table 19.
Supplied External Wiring Terminal Hardware Kit ................................................................................... 40
Table 20.
Recommended Installation Parts and Tools (Not Supplied by Eaton) ......................................................... 40
Table 21.
480V Power Cable Conduit Requirements .......................................................................................... 41
Table 22.
415V /400V/380V Power Cable Conduit Requirements .......................................................................... 42
Table 23.
Recommended Input Circuit Breaker Ratings (100% and 80% Load Rating) ............................................... 43
Table 24.
Recommended Bypass, Output, and MOB Circuit Breaker Ratings (100% and 80% Load Rating)................... 44
Table 25.
Recommended DC Input Battery Disconnect Ratings – Common Battery .................................................. 45
Table 26.
Recommended DC Input Battery Disconnect Ratings – Separate Battery .................................................. 45
Table 27.
TB1, TB2, and TB3 Interface Connections .......................................................................................... 80
Table 28.
REPO Wire Terminations ................................................................................................................ 88
Table 29.
Powerware Hot Sync CAN Bridge Card Interface Connections ................................................................ 97
Table 30.
CAN Bridge Card Wiring Terminations.............................................................................................. 100
Table 31.
Pull-Chain Wiring Terminations ....................................................................................................... 101
Table 32.
Pull-Chain Wiring Terminations with MOBs ....................................................................................... 103
Table 33.
RMP II, RIM II, or SCM II Wiring Terminations ................................................................................... 105
Table 34.
J1 through J4 Interface Connectors................................................................................................. 107
Table 35.
Status Indicators......................................................................................................................... 140
Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
xvii

Advertisement

Table of Contents
loading

Table of Contents