Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual page 69

Table of Contents

Advertisement

C C h h a a p p t t e e r r 4 4 U U P P S S S S y y s s t t e e m m I I n n s s t t a a l l l l a a t t i i o o n n
4 4 . . 1 1
P P r r e e l l i i m m i i n n a a r r y y I I n n s s t t a a l l l l a a t t i i o o n n I I n n f f o o r r m m a a t t i i o o n n
Installation should be performed only by qualified personnel.
L'installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
Chapter 3 UPS Installation Plan and Unpacking
terminal data, and installation notes.
Do not tilt the cabinets more than ±10° during installation.
Remove the conduit landing plates to add conduit landing holes as required. Plate material is 16 gauge
steel (1.5 mm/0.06" thick).
If perforated floor tiles are required for ventilation, place them in front of the UPS.
4 4 . . 2 2
U U n n l l o o a a d d i i n n g g t t h h e e I I S S B B M M w w i i t t h h U U P P M M S S e e c c t t i i o o n n f f r r o o m m t t h h e e P P a a l l l l e e t t
The ISBM cabinets with a UPM or UPMs are joined and bolted to a wooden pallet supported by wood skids.
They are referred to as the UPS.
The ISBM with UPM or UPMs section is heavy (see
closely followed, the cabinets may tip and cause serious injury.
Les sections de l'onduleur sont lourdes (voir le tableau
déchargement et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de graves
blessures.
AVERTISSEMENT!
for cabinet dimensions, equipment weight, wiring and
Table
AVERTISSEMENT!
Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
2). If unpacking and unloading instructions are not
Table
2). Suivre attentivement les instructions de
51

Advertisement

Table of Contents
loading

Table of Contents