UPS System Installation
Figure 18. Removing the ISBM Section Right Side Shipping Bracket
ISBM Removable
Front Panels
Pallet
4.
Using a forklift (see the caution statement at the beginning of this procedure), raise the UPS cabinet
section until the cabinet bottom clears the pallet by approximately 3 mm (1/8").
5.
Pull the pallet from under the UPS cabinet. Discard or recycle the pallet in a responsible manner.
6.
Carefully lower the UPS cabinet until the cabinet base contacts the floor.
7.
Repeat Steps 2 through 6 for the remaining cabinet.
8.
Proceed to paragraph
54
Eaton
®
Right Side Shipping
Bracket
4.3 Mechanically Joining the
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
For 4-wire
systems only
Sections.
Shipping Bracket
Bolts
Shipping Bracket
Bolts