Kubota 07-CR-E5 Manual page 57

Common rail system
Table of Contents

Advertisement

07-CR-E5,07-CR-TE5,07-CR-TIE5, DM
3. Glow relay actuation test
• Operate as shown in the diagram below and in accordance with the requests from the tool.
Service
Operate repeatedly between ON and OFF in accordance with the specified cycle.
specification
4. Intake throttle valve actuation test
• Operate as shown in the diagram below and in accordance with the requests from the tool.
Low side: When target intake throttle valve opening of 10 % and 25 % are given alternately, there must not be disparity in
Service
the intake throttle valve lift.
specification
High side: When target intake throttle valve opening of 70 % and 85 % are given alternately, there must not be disparity in
the intake throttle valve lift.
(1) Opening
NOTE
• In some cases the actual opening may be different from the target opening.
The reason for this is because the learning value is always reflected for 0 lift, after being used for a long
time 0 points are shifted.
As such, the service specification is a relative evaluation and not an absolute evaluation.
(2) Operation Check on the Fully
Open Valve Side
1-S19
(3) Operation Check on the Fully
Closed Valve Side
COMMON RAIL SYSTEM
KiSC issued 03, 2022 A

Advertisement

Table of Contents
loading

Table of Contents