Kubota 07-CR-E5 Manual page 215

Common rail system
Table of Contents

Advertisement

07-CR-E5,07-CR-TE5,07-CR-TIE5, DM
2. Measure the Engine ECU Terminal Voltage
1. Move the key switch from the OFF to the ON position, and
measure the voltage between engine ECU terminals E68 and
E78 and between terminals E49 and E78.
2. Next, start the engine, change the depressed amount of the
accelerator pedal, and check the same items again.
Depends on the rotation speed, load (After warm-up)
1. When stopped: Approx. 1.0 V
Service
2. When idling: 1.65 to 1.80 V
specification
3. During no-load maximum speed: 2.50 to 2.85 V
4. During acceleration: 2.5 to 3.3 V
OK
Check the harness connectors and engine ECU pins.
OK
Faulty engine ECU → Replace.
NG
Replace the wiring harness, or replace the engine ECU.
NG
Go to "3. Measure the voltage between rail pressure sensor terminals -
1".
3. Measure the Voltage Between Rail Pressure Sensor
Terminals - 1
1. Place the key switch in the ON position, and measure the
voltage between terminals (2) and (3) of the rail pressure sensor
at the wiring harness side.
2. Next, start the engine, change the depressed amount of the
accelerator pedal, and check the same items again.
Depends on the rotation speed, load (After warm-up)
1. When stopped: Approx. 1.0 V
Service
2. When idling: 1.65 to 1.80 V
specification
3. During no-load maximum speed: 2.50 to 2.85 V
4. During acceleration: 2.5 to 3.3 V
OK
Check the wiring harness (between engine ECU terminals E49 / E68 and
sensor terminal (2)). → Replace the faulty area.
NG
Go to "4. Measure the voltage between rail pressure sensor terminals -
2".
(1) Terminal A-VCC1
(2) Terminal PFUEL
(3) Terminal PFUEL RTN
1-S177
COMMON RAIL SYSTEM
9Y3200007CRS0236US0
(a) Pin Assignment
9Y3200007CRS0237US0
KiSC issued 03, 2022 A

Advertisement

Table of Contents
loading

Table of Contents