Assembly Replacement Procedures
RF Area (Options 503, 508, 513, 526)
Figure 16-16
YTO Screws
Replacement
1. Refer to
2.
3. Replace the ribbon cable W23. Ensure the locking latch is engaged.
4. Refer to
5. Replace the front panel. Refer to the
6. Replace the instrument outer case. Refer to the
438
Figure
16-16. Place the YTO into the chassis. Replace the two
screws (1) (0515-0372). Torque to 9 inch-pounds.
Figure
16-15. Replace the cables W4 and W20. Torque to 10 inch-pounds.
Figure
16-7. Position the RF bracket onto the chassis and replace
the sixteen screws (0515-0372). Torque to 9 inch-pounds.
procedure.
replacement procedure.
Front Frame Assembly
Instrument Outer Case
N9030A PXA Signal Analyzer Service Guide
replacement