8. Route the USB and video cables through the opening.
9. If installing the front 2SFF stacked drive cage, install the drive cage.
10. Install the universal media bay.
11. Connect the cables.
12. Install the access panel .
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server .
HPE ProLiant DL380 Gen11 Server User Guide
92