HPE ProLiant DL380 Gen11 User Manual page 64

Hide thumbs Also See for ProLiant DL380 Gen11:
Table of Contents

Advertisement

13. Install the access panel .
14. Slide the server into the rack.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server .
Results
Results
The installation is complete.
Installing a front 2SFF stacked drive cage
Installing a front 2SFF stacked drive cage
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
The components included with the hardware option kit
This installation requires a universal media bay.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
4. Remove the access panel .
5. Remove the drive cage blank.
HPE ProLiant DL380 Gen11 Server User Guide
64

Advertisement

Table of Contents
loading

Table of Contents