7. Install the storage controller.
8. Connect the cables.
9. Install the access panel .
10. Slide the server into the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server .
HPE ProLiant DL380 Gen11 Server User Guide
54