8. If internal cables are required for the expansion board, connect the cables.
9. Install the riser cage.
10. Connect the cables.
11. Install the access panel .
12. Slide the server into the rack.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server .
Results
Results
The installation is complete.
Cooling
Cooling
HPE ProLiant DL380 Gen11 Server User Guide
57