9. Install the access panel .
10. Slide the server into the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server .
Results
Results
The installation is complete.
Installing a tertiary riser cage
Installing a tertiary riser cage
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
Procedure
1. Observe the following alert.
CAUTION: To prevent damage to the server or expansion boards, power down the server and remove all AC power
CAUTION:
cords before removing or installing the PCI riser cage.
2. Power down the server.
3. Do one of the following:
Disconnect each power cord from the power source.