HPE ProLiant DL380 Gen11 User Manual page 119

Hide thumbs Also See for ProLiant DL380 Gen11:
Table of Contents

Advertisement

About this task
About this task
If you do not require in-rack serviceability for your rack-mounted server, use the rack rail hook-and-loop strap, instead of a CMA, to manage
the rear panel cables. The hook-and-loop strap can be installed on either the left or right rack mounting rail.
Procedure
Procedure
1. Attach the strap carabiner to the rack mounting rail.
2. Bundle the rear panel power cords and peripheral cables, and then wrap the strap around the cables.
Installing the cable management arm
Installing the cable management arm
Prerequisites
Prerequisites
Before you perform this procedure, review the Rack warnings and cautions.
T-25 Torx screwdriver—This tool is required if the shipping screws located inside the chassis ears need to be loosened or tightened.
About this task
About this task
The cable management arm (CMA) allows the server to be fully extended from the server without the need to power off the system or
disconnect any rear panel cables. This CMA is designed for ambidextrous implementation.
For the purpose this procedure, left and right terminology is from the perspective of a user facing the front of the server.
CAUTION:
CAUTION:
Support the CMA during the removal and replacement procedures. Do not allow the CMA to hang by its own weight during
the procedure.
Procedure
Procedure
1. Connect and secure all peripheral cables and power cords to the rear panel.
2. (Optional) The CMA retention bracket can be rotated to fit a left- or right-hand CMA operation. Press and hold the rotate mechanism
(callout 1), and then rotate the bracket 180°(callout 2).
There will be an audible click to indicate that the bracket is locked in its adjusted position.
HPE ProLiant DL380 Gen11 Server User Guide
119

Advertisement

Table of Contents
loading

Table of Contents