9. Install drives or drive blanks.
10. Push down on the latches to lower the drive cage into place.
11. Connect the power and data cables to the drive backplane .
12. Install the riser cages .
13. Install the access panel .
14. Slide the server into the rack.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server .
Results
Results
The installation is complete.
Installing a rear 2SFF stacked drive cage
Installing a rear 2SFF stacked drive cage
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
The components included with the hardware option kit
The front bays are fully populated with 12 LFF or 24 SFF drives
High-performance fans are installed in all fan bays
Procedure
Procedure
HPE ProLiant DL380 Gen11 Server User Guide