8. Install the riser cage.
9. Connect the cables.
10. Install the access panel .
11. Slide the server into the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server .
Results
Results
The installation is complete.
Optical drives and media bays
Optical drives and media bays
HPE ProLiant DL380 Gen11 Server User Guide
90