6. If needed, connect the extension cable.
7. Connect the cable to the system board.
8. Install the access panel .
9. Install the server in the rack.
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server .
Results
Results
The installation is complete.
Management
Management
HPE ProLiant DL380 Gen11 Server User Guide
79