HPE ProLiant ML350 Gen11 User Manual page 84

Hide thumbs Also See for ProLiant ML350 Gen11:

Advertisement

3. Disconnect all peripheral cables from the server.
4. With the server installed in the rack, hold the shipping bracket against the rack column and note the correct mounting locations for
both the brackets and the cage nuts as shown in the following image.
5. Slide the server tray out of the rack:
a. Loosen the server tray thumbscrews (callout 1).
b. Grasp the tray notch and slide the server out of the rack (callout 2).
6. If you are installing the server in a square-hole rack, install the cage nuts. When installed, the flanges on the cage nut should face
the outside of the rack:
a. Hook the bottom flange of the cage nut in the rack hole.
b. Insert the tip of the insertion tool through the hole and hook the top flange of the cage nut.
HPE ProLiant ML350 Gen11 Server User Guide
84