Download Print this page

HPE ProLiant ML350 Gen11 User Manual page 83

Hide thumbs Also See for ProLiant ML350 Gen11:

Advertisement

7. Verify the operation of the rack rails:
Two people might be needed for this procedure: one to slide the chassis in and out of the rack, and the other to observe the rear
panel cables and power cords.
a. Fully extend the chassis out of the rack.
b. Check that there is enough slack in the cables and cords for full extension of the chassis. Make sure that there is no cable
binding or crimping.
c. To ensure that the cables and cords are secured properly, slide the chassis in and out of the rack. Make sure that there is no risk
of accidental disconnection of the peripheral cables and power cords.
Results
Results
The installation is complete.
Installing the shipping hardware
Installing the shipping hardware
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
Cage nut insertion tool
T-25 Torx screwdriver
Phillips No. 2 screwdriver
About this task
About this task
If you intend to transport or ship a rack-mounted server to a new location, make sure that the shipping hardware is installed. The
shipping hardware protects the server from vibration damage that might occur during server shipment.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
HPE ProLiant ML350 Gen11 Server User Guide
83

Advertisement

loading