4. Install the drive.
LFF drive
SFF drive
5. Determine the status of the drive from the drive LED definitions .
6. Install the front bezel .
7. To configure drive arrays, see the Configuring storage controllers.
HPE ProLiant ML350 Gen11 Server User Guide
69