Download Print this page

HPE ProLiant ML350 Gen11 User Manual page 75

Hide thumbs Also See for ProLiant ML350 Gen11:

Advertisement

Install the rack rails and server tray
Install the rack rails and server tray
About this task
About this task
The rack rails can be installed in a round-hole or a square-hole racks. The rack rails occupy 1U space in the rack.
Procedure
Procedure
1. Disassemble the rack rail assemblies:
a. Pull out the inner sliding rail until it is fully extended (callout 1).
b. Slide and hold the white release tab in the direction shown, and then remove the sliding rail from the mounting rail (callout 2).
2. Install the sliding rails on the server tray:
a. Insert the spools on the sides of the server through the notches on the rails (callout 1).
b. Slide the rail towards the rear of the tray to lock it into place (callout 2).
HPE ProLiant ML350 Gen11 Server User Guide
75

Advertisement

loading