Download Print this page

HPE ProLiant ML350 Gen11 User Manual page 4

Hide thumbs Also See for ProLiant ML350 Gen11:

Advertisement

HPE Installation Service
Setting up the server
Removing the shipping brackets
Operations
Power down the server
Extend the server from the rack
Remove the server from the rack
Remove the front bezel
Position the tower server for hardware configuration
Remove the access panel
Remove the fan cage
Remove the primary riser cage
Remove the secondary riser cage
Remove the HPE NS204i Boot Device
Install the primary/secondary riser cage
Install the fan cage
Install the access panel
Position the tower server for operation
Install the front bezel
Install the server into the rack
Power up the server
Hardware options installation
Server data backup
Hardware option installation guidelines
Drive options
Drive installation guidelines
Installing a hot-plug SAS, SATA, or NVMe drive
Power supply options
Hot-plug power supply calculations
Power supply warnings and cautions
Installing an AC power supply
Tower-to-rack conversion kit
Installing the tower-to-rack conversion kit
Install the rack rails and server tray
Install the server into the rack
Install the cable management arm
Installing the shipping hardware
Drive cage options
Installing the 4 LFF drive cage
Installing the 8 SFF drive cage
Media device options
USB RDX backup system option
Installing a USB RDX docking station
Enable the increased cooling function

Advertisement

loading