5. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
6. Make sure that the power supply LED is green.
Results
Results
The installation is complete.
Tower-to-rack conversion kit
Tower-to-rack conversion kit
Use the tower-to-rack conversion kit to switch the tower server to rack mode operation. A rack-mounted server occupies 5U space in
the rack and supports in-rack serviceability for all server components.
Kit contents
Kit contents
Left and right rack rail assemblies
Server tray
Cable management arm
Chassis rear bracket screws (3)
Shipping hardware – Install these hardware only if you intend to transport or ship a rack-mounted server to a new location.
Shipping brackets (2)
Shipping bracket screws (4)
M5 square-hole cage nuts (4)
Rear shipping screws (2)
Subtopics
Subtopics
Installing the tower-to-rack conversion kit
Installing the tower-to-rack conversion kit
Installing the shipping hardware
Installing the shipping hardware
HPE ProLiant ML350 Gen11 Server User Guide
73