Download Print this page

HPE ProLiant ML350 Gen11 User Manual page 105

Hide thumbs Also See for ProLiant ML350 Gen11:

Advertisement

8. Install a DIMM in the performance heatsink configuration:
a. Open the DIMM slot latches.
b. Carefully slide the DIMM under the performance heatsink (callout 1).
c. Fully press the DIMM into the slot until the latches snap back into place (callout 2).
9. Install the fan cage.
10. Install the access panel
11. Do one of the following:
Orient the server back in tower mode .
Install the server into the rack .
12. Connect all peripheral cables to the server.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
HPE ProLiant ML350 Gen11 Server User Guide
105

Advertisement

loading