Installing the tower-to-rack conversion kit
Installing the tower-to-rack conversion kit
About this task
About this task
In this procedure, left and right terminology is from the perspective of a user facing the front of the rack.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
5. Remove the chassis feet:
a. Loosen the screws on the chassis (callout 1).
b. Detach the chassis feet (callout 2).
6. Install the rack rails and server tray .
7. Install the server into the rack .
8. Install the cable management arm .
Results
Results
The installation is complete.
Subtopics
Subtopics
Install the rack rails and server tray
Install the rack rails and server tray
Install the server into the rack
Install the server into the rack
Install the cable management arm
Install the cable management arm
Install the rack rails and server tray
Install the rack rails and server tray
HPE ProLiant ML350 Gen11 Server User Guide
74

Advertisement

loading