Agilent Technologies NovoCyte Quanteon Operator's Manual page 69

Flow cytometer
Table of Contents

Advertisement

Instrument Operation
Gently press the power switch on the front panel of the instrument or click the
Instrument > Shut Down icon
shutdown process, the power switch light will be flashing green, and the
instrument will automatically perform the shutdown cleaning process. After
the shutdown process is completed, power is automatically turned off and the
power switch light goes out.
When shutdown is initiated from NovoExpress software, if no additional function
NOTE
option is selected, the instrument automatically performs the shutdown cleaning
process and turns off the power, and no user interference is needed. If additional
function option is selected, please refer to
this guide for more information.
2
Turn off the NovoCyte Workstation.
3
Follow the instructions described in
add more reagent to NovoFlow, NovoClean and NovoRinse containers.
4
Follow the instructions described in
waste container.
NovoCyte Quanteon Flow Cytometer Operator's Guide
on the NovoExpress software. During the
Clean the Sample Injection Probe (SIP)
Add Instrument Reagents
Empty Waste
in this guide to Empty the
in
in this guide to
69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents