Thermo Scientific EA IsoLink IRMS System Operating Manual page 90

Including the flash irms elemental analyzer
Table of Contents

Advertisement

3
Installing Flash IRMS Elemental Analyzer
Installing the Reactors into the Furnaces
Figure 61. Introduction of the Combustion Reactor into the Right Furnace (3)
4. Finger-tighten the reactor retaining nut until it starts to grip the coupling union.
5. Use the coupling union fixing tool and the 32-mm wrench to tighten the retaining nut.
See
Figure 62. Introduction of the Combustion Reactor Into the Right Furnace (4)
CAUTION Use appropriate pressure to obtain a good sealing (1/4 to 1/2 turn). Do not overtighten
the retaining nut to avoid reactor damaging.
6. To complete the operation manually screw the fixing nut of the autosampler. See
Figure 63. Reinstall MAS Plus Autosampler
7. Close the furnace compartment with the protecting plate and the front cover.
62
EA IsoLink IRMS System for CNSOH Operating Manual
Figure
62.
32-mm Wrench
Coupling Union Fixing Tool
Nut
Retaining Nut
Coupling Union
Figure
63.
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents