9
Running the Flash IRMS as Stand-alone Instrument
Configuring the Analyzer
Figure 153. Example of Analyzer Parameters
a. Click Send to transfer the operating parameters to the instrument. From now on the analyzer
b. The furnaces begin to heat, and the helium flows in the circuit. After about 50 minutes the
146
EA IsoLink IRMS System for CNSOH Operating Manual
is working.
furnaces reach the temperature settings, and the LED Ready on the status panel lights up.
The instrument is now ready to run analyses. However, before starting an analytical cycle, a
leak test must be carried out for checking the Carrier and Reference pneumatic circuits are
free of leaks.
Note The leak test must be performed also any time a component of the pneumatic
circuit is replaced for checking that reactors, filters, if any, and gas chromatographic
columns have been properly installed. See the section
page 147
for details.
"Performing a Leak Test"
on
Thermo Scientific
Need help?
Do you have a question about the EA IsoLink IRMS System and is the answer not in the manual?
Questions and answers