Figure 54. Introduction of the Reactor with a Bottom Feed Connector (2)
Figure 55. Introduction of the Reactor with a Bottom Feed Connector (3)
3. Now unscrew the nut and slip it with washer and o-ring over the ceramic tube at the bottom. Fix
it using the steel rod and a 32 mm wrench. See
Figure 56. Introduction of the Reactor with a Bottom Feed Connector (4)
4. Slowly insert the granules into the glassy carbon tube from top. Make sure no granule blocks the
tube. Check the height with the mark on the graphite crucible remover tool by placing the crucible
Thermo Scientific
3
Installing Flash IRMS Elemental Analyzer
Retaining Nut
Conical
O-ring
Bottom Feed Connector
Figure
56.
32-mm Wrench
Coupling Union Fixing Tool
EA IsoLink IRMS System for CNSOH Operating Manual
Installing the Reactors into the Furnaces
Washer
59