Chapter 2 Installation; Inspection; Check Line Voltage; Fuse Exchange - Prodigit 3270 Series Operation Manual

Ac/dc high power electronic load
Table of Contents

Advertisement

Chapter 2 Installation

2-1 Inspection

The 3270 Series high power AC/DC load was carefully inspected before shipment. If
instrument damage has occurred during transport, please inform Prodigit's sales and service
office or representative.
Your 3270 Series high power AC/DC load was shipped with a power cord for the type of
Terminal blocks used at your location. If the appropriated cord was not included, please
contact your nearest Prodigit sales office to obtain the correct cord. Refer to "check line
voltage "to check the line voltage is 100V~230Vac.

2-2 Check line voltage

The 3270 Series high power AC/DC load can operation with 100 Vac ~230Vac input as
indicated on the label on the rear panel.
Make sure that the factory check mark corresponds to your nominal line voltage. Skip this
procedure if the label is corrected marked.
2.2.1.
With the 3270 Series AC/DC load power OFF, disconnect the power cord.
2.2.2.
Refer the drawing on the rear panel of 3270 Series high power load in Fig 2-1.

2-3 Fuse Exchange

This product has the power fuse, and exchanges it according to the following procedure.
Never fail to turn off the power of this product, and disconnect the plug of the AC Power
cable.

Fig 2-1 3270 Series AC Input Connection

3270 Series Operation Manual 15

Advertisement

Table of Contents
loading

Table of Contents