Calibration And Adjustments - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-9-4-3

Calibration and adjustments

No calibrations or adjustments are needed after this part replacement.
8-9-4-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-9-4-5
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
See:
Section
4-2-2
4-2-3
4-3-13
4-3-5
4-3-7
4-3-17
8 - 224
. 2
EV
Table 8-138 BEP I/O and Side I/O replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Mechanical Function Checks
Section 8-9 - BEP (Back End Processor) parts replacement
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all
required checks and is ready for use.
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents