GE LOGIQ E9 Service Manual page 601

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Section 9-6
Table 9-6
BREAKTHROUGH
LOGIQ E9
(Phase 1)
Table 9-7
BREAKTHROUGH
LOGIQ E9
(BT10)
. 2
EV
Software
(cont'd)
R1.0.x Software Matrix
APPLICATION SOFTWARE VERSION
(Initial Production Release)
(Full Production release. Included in
FMI 70201 for Installed Base)
(Support for DVR option)
(Minor improvement for usability and
Cost reduction DRX 3.1 P/N 5301040-4 and
Backplane P/N GA200685 boards support)
R2.0.x Software Matrix
APPLICATION SOFTWARE VERSION
(Initial Production Release,
also included in FMI 70205)
(Full Production Release,
Support the relocation of the Option Dongle and
connection of the USB Cable from the BEP to the XYZ
Controller. Relocation of the Option Dongle and
connection of the USB Cable from the BEP to the XYZ
Controller, also included in FMI 70206 with R 2.0.4.)
(V Nav Needle Tracker Upgrade)
Chapter 9 Renewal Parts
R 1.0.3
R 1.0.4
R 1.0.5
R 1.0.6
R2.0.3
R 2.0.4
R 2.0.5
LOGIQ E9 S
ERVICE
BEP 5145000-2
APPLICATION
BASE IMAGE LOAD
PART NUMBER
Part Number
5193239-4
5193239-5
5135124-20
5193239-6
5193239-8
BEP 5145000-2
APPLICATION
BASE IMAGE LOAD
PART NUMBER
Part Number
5193239-12
5135124-30
5193239-13
5193239-16
M
ANUAL
9 - 7

Advertisement

Table of Contents
loading

Table of Contents