8-6-2-7
Calibration and adjustments
Refer to:
Monitor Arm and Monitor Friction Adjustment.
8-6-2-8
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
NOTE:
Wide Screen Monitors may need a second reboot for the system to fully identify the monitor's
USB device. To confirm, verify that the Monitor Controls for the Wide Screen Monitors are
available on the Touch Panel Utility pages.
8-6-2-9
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Equipment passed all required checks and is ready for use.
See:
Section
4-2-2
4-2-3
4-3-5
4-3-7
8 - 106
. 2
EV
Section 6-2 "Monitor adjustments" on page 6-1
Table 8-66
LCD Monitor assembly replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
B-Mode Checks
System CFM and PWD Checks
Section 8-6 - Replacing Top Console Parts
for LCD Monitor calibration instructions and/or
Debrief Script
LOGIQ E9 Service Manual, Direction
5573152-100, Rev. 2. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
LOGIQ E9 S
M
ERVICE
ANUAL