GE LOGIQ E9 Service Manual page 452

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-112 Elastomer Lower Op Panel Replacement
2. On the bottom side of the Lower
Bezel, pull through the elastomer
guides until they lock in.
Double check that all 16 elastomer
guides (anchors) are pulled through
all the way, or else it will not seat
properly.
Install the Trackball.
Reattach the Power and USB
cables.
3. When replacing the Lower Op
Panel Bezel:
• Make sure that carriers, buttons,
knobs are all in place before setting
the Lower Op Panel Board on top of
the Lower Bezel.
• Ensure that the board is flat on top
of the bezel. Put a few screws in,
then flip it over to make sure none of
the buttons are 'cocked,' or out of
place.
• Replace the remaining screws.
D. Replace the TGC dust gasket.
The clear, plastic backing must be
facing down when the bezel is
installed. (The clear, plastic backing
should be facing up from this view.)
8 - 168
. 2
EV
Steps
Section 8-6 - Replacing Top Console Parts
Corresponding Graphic
Elastomer Guides - top view (not
all elastomer anchors are identified
Lower Op Panel Board and Lower Bezel
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents