GE LOGIQ E9 Service Manual page 540

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-10-4-4-4
4D MC Re-installation for Lambda PS
Table 8-161 4D MC Re-installation for Lambda PS
1.
Install the two screws (circled),
supplied with the replacement 4D MC
to secure the 4D MC to the 4D MC
Cover.
NOTE: The replacement 4D MC
includes a two USB Cables, the longer
USB Cable must be used for a Lambda
PS.
Connect the long USB Cable to the 4D
MC. Route the cable as shown.
2.
Insert the 4D MC and cover into the PS,
along the mounting rails (circled).
NOTE: There are four mounting rails,
two at the top (circled) and two in the
bottom. Make sure all are aligned to
ensure the 4D MC connects to the
Lambda PS. The 4D MC connects
directly to the Lambda PS.
8 - 256
. 2
EV
Steps
Section 8-10 - Main Power Supply parts replacement
LOGIQ E9 S
Corresponding Graphic
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents