V2 Monitor Arm Assembly Adapter replacement - R4.x and later
Manpower /
Time
One person /
30 minutes
Table 8-78
NOTICE
TAG
&
LOCKOUT
Signed
Date
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes.
NOTE: If you are replacing the V2 Monitor Arm Assembly Adapter replacement, you do not need to remove the monitor
from the arm.
3. Remove the Monitor and Arm Assembly and the Bulkhead cover.
Preparation Links (if you need more information):
• 4-2-3 "Power shut down" on page 4-6.
• 8-6-3-2 "LCD Monitor V2 Arm assembly (Daeil) replacement (used in R4.x production)" on page 8-111.
• 8-5-22 "Bulkhead Cover replacement" on page 8-81.
8 - 126
. 2
EV
Table 8-77
Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
Preparations and Preparation Links
Preparations - you must perform the following steps
Energy Control and Power Lockout for LOGIQ E9
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO
VOLTAGE GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE
ARE NO TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL
ON/OFF BUTTON WILL TURN OFF.
5. DISCONNECT THE BATTERY FROM THE CHARGEBOARD AT PCN1 WHEN
WORKING IN THE BEP. THIS SHOULD BE DONE WHENEVER THE BEP IS OPEN AND
THE EPS OR CHARGEBOARD IS EXPOSED AND CHANGING PARTS.
Beware that the Main Power Supply, Extended Power Shutdown or ChargeBoard and BEP
may be energized even if the power is turned OFF if the cord is still plugged into the AC
Outlet.