GE LOGIQ E9 Service Manual page 79

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
3-6-7-4
Switch ON the AC Power to LOGIQ E9
1.) Switch ON the Mains Power Circuit Breaker at the rear of the unit. The ON/OFF button will become
amber.
Figure 3-16 The Circuit breaker and ON/OFF button
You should hear a "click" from the relays in the AC Power and the unit is ready to boot. The ON/OFF
button will turn amber. This indicates that there is power to the PS, but the system is OFF.
2.) Press once on the ON/OFF button on the Operator Panel to boot the unit. The ON/OFF button will
turn green when it is pressed.
During a normal boot, you may observe that:
a.) The unit's ventilation fan starts on full speed, but slows down after a few seconds (listen to the
b.) Power is distributed to the peripherals, Operator Panel (Console), Monitor, Front End
c.) Back End Processor and rest of the LOGIQ E9 starts with the sequence listed in the next steps:
d.) Back End Processor is turned ON and starts to load the software.
e.) The Start Screen is displayed on the monitor.
f.) A start-up bar indicating the time used for software loading, is displayed on the monitor.
g.) The software initiates and sets up the Front End electronics and the rest of the instrument.
h.) The backlight in the keyboard is lit.
i.) As soon as the software has been loaded, either a 2D screen is displayed on the screen,
. 2
EV
fan sound).
Processor and Back End Processor.
indicating that a probe has been connected, or a No Mode screen is displayed, indicating that
no probe has been connected.
Chapter 3 LOGIQ E9 Setup
LOGIQ E9 S
M
ERVICE
ANUAL
3 - 25

Advertisement

Table of Contents
loading

Table of Contents