GE LOGIQ E9 Service Manual page 46

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
2-2-2-4
Site circuit breaker
POWER OUTAGE MAY OCCUR.
CAUTION
THE LOGIQ E9 SCANNER REQUIRES A DEDICATED SINGLE BRANCH CIRCUIT. TO AVOID
CIRCUIT OVERLOAD AND POSSIBLE LOSS OF CRITICAL CARE EQUIPMENT, MAKE SURE
YOU DO NOT HAVE ANY OTHER EQUIPMENT OPERATING ON THE SAME CIRCUIT.
It is recommended that the branch circuit breaker for the LOGIQ E9 be readily accessible.
2-2-2-5
Site power outlets
A dedicated AC power outlet must be within reach of the LOGIQ E9 without extension cords. Other
outlets adequate for the external peripherals, medical and test equipment needed to support this
LOGIQ E9 must also be present within 1 m (3.2 ft.) of the LOGIQ E9. Electrical installation must meet
all current local, state, and national electrical codes.
2-2-2-6
LOGIQ E9 power plug
If the LOGIQ E9 arrives without a power plug, or with the wrong plug, you must contact your GE dealer
or the installation engineer must supply what is locally required.
2-2-2-7
Power stability requirements
Voltage drop-out
Max 10 ms.
Power transients (all applications)
Less than 25% of nominal peak voltage for less than 1 millisecond for any type of transient, including
line frequency, synchronous, asynchronous, or aperiodic transients.
2 - 4
. 2
EV
Section 2-2 - General console requirements
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents