GE LOGIQ E9 Service Manual page 84

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
3-6-9
Complete power down (cont'd)
Figure 3-21 System - Exit / Download menu
2.) Select Shutdown to do a complete power down of the unit.
The Back End Processor will first turn off the LOGIQ E9 activity and print the message "Please wait
- Shutdown in progress in the LCD display on the Operator Panel.
Next, it starts to shut down itself. The time to turn down the unit, including the Back End Processor,
may vary from 10 seconds up to approximately 1 minute.
The last thing that shuts down, is the light on the Operator Panel, indicating that you can continue
with the next step.
Be sure to wait with the next step until the system has finished its shut-down. Failing to do so, may
NOTICE
destroy data on the Hard Disk Drive, making the system fail later.
3.) Switch off the Mains Power Circuit Breaker, located on the rear of the unit. This will cut power
distribution within the unit.
For optimum system operation, it is recommended that a full shutdown of the system is performed at
NOTICE
least once every 24-hour period. If you shut down the system at the end of the day, no other action is
needed.
Before returning a system to the customer, perform the functional checks. See:
checks" on page
3 - 30
. 2
EV
4-26.
Section 3-6 - Completing the setup
LOGIQ E9 S
M
ERVICE
ANUAL
Section 4-3 "Functional

Advertisement

Table of Contents
loading

Table of Contents