GE LOGIQ E9 Service Manual page 329

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-5-9
Plate Connectors w/Guide replacement
NOTE:
The Plate Connectors w/Guide is replaced, it does not include the Probe Connectors Label. If
the Plate Connectors w/Guide is replaced, the Label MUST BE installed. Or, if only replacing
the Label, see:
Manpower /
Time
One person /
15 minutes
Table 8-31
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
3. Remove the Side Covers, Top Cover, Foot Rest Bumper and the Front Cover.
Preparation Links (if you need more information):
• 4-2-3 "Power shut down" on page 4-6.
• 8-5-3 "Side Covers replacement" on page 8-28.
8-5-5 "Top Cover replacement" on page 8-35.
• 8-5-7 "Foot Rest Bumper replacement" on page 8-40.
• 8-5-8 "Front Cover replacement" on page 8-42.
8-5-9-1
Plate Connectors w/Guide removal
The Plate Connectors w/Guide is attached with hatches.
1.
Use a flat bladed screwdriver to loosen the hatches.
Remove the Plate Connectors w/Guide.
. 2
EV
Table 8-33 "Probe Connectors Label Placement" on page
Table 8-30
Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Preparations and Preparation Links
Preparations - you must perform the following steps
Table 8-32
Plate Connectors w/Guide removal
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
8-46.
Tools
Corresponding Graphic
M
ERVICE
ANUAL
8-5.
8 - 45

Advertisement

Table of Contents
loading

Table of Contents