GE LOGIQ E9 Service Manual page 414

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-6-4-2
V2 Monitor Arm Assembly Adapter installation
Table 8-80
1.
Early R5 production and earlier:
Insert the Adapter into the Frame UI Upper
Assembly.
Align the mounting holes and install the two
M5 x 50 hex key screws using a 4 mm Hex
Key to secure the Adapter. Torque 2.5 Nm
(1.8 lbf-ft {21.6 lbf-in}).
NOTE: Note the shape of the rear
mounting hole, this is important for the
next step before the Thrust Plate is
installed.
2.
NOTE: MAKE SURE the rear mounting
hole for the Arm Neck Lock Pin, in the Trust
Plate is aligned with the rear mounting hole
of the Adapter BEFORE installing the
Plate. If the Plate is installed incorrectly, it
may be very difficult to remove.
Align the rear mounting hole for the Arm
Neck Lock Pin, in the Trust Plate with the
rear mounting hole of the Adapter.
Seat the Plate. The plate will be captured
by the two retaining pins that protrude from
the Adapter.
3.
Later R5 production and later:
NOTE: Note the shape of the REAR
mounting hole, this is important for when
the UI Boss Bearing is installed.
8 - 130
. 2
EV
V2 Arm Adapter installation
Steps
Section 8-6 - Replacing Top Console Parts
LOGIQ E9 S
Corresponding Graphic
(rear of LOGIQ E9)
(Op Panel, front of LOGIQ E9)
(rear of LOGIQ E9)
(Op Panel, front of LOGIQ E9)
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents